=
-45-
as practicable.
(b)
279
That a similar equipment for 2,500 lines be installed in a new exchange building at Kowloon. (c) That dehumdifying plant be provided at both of
these exchanges.
(a)
(e)
That the Magneto Exchange at the Peak be continued
for two years after the Kowloon Exchange has been
opened and that it be then converted to Automatic
the conversion to take place earlier in the event
of the development warrenting this course.
That small Magneto Exchanges be installed as soon
as practicable in the neighbourhood of Quarry Bay
(Shaukiwan) and at Taipo.
(f) That the proposals now under consideration for
the establishment of small Exchanges at Kowloon
Tong and Kowloon City be proceeded with as soon
as practicable.
(g) That any exchanges that may be required in the
future at the small outlying towns on the Island
or in the New Territories be of Magneto type.
(44).
Estimated cost of proposals.
The estimated expenditure, exclusive of buildings,
and of the distribution network, which the foregoing proposals
will involve is indicated in statement marked "C".
(45).
Conclusion.
If it should be decided to proceed with the foregoing Automatic proposals it would be advisable for Mr. Bennett to proceed to England in order to furnish tenderers with first hand information on the many pointe which invariably
crop up in connection with schemes of this nature.
His visit
No comments yet.
Private notes are available after approval.